10117985Saudi Aramco vendor code
1960196028Saudi Contractors Authority
7028552532Commercial registration
347802Chamber of Commerce

§ 1Registrations

Registered and on record.

Saudi Aramco · Supplier Registration Unit

Supplier Management System registration

Vendor code
10117985
Supplier type
Service provider
Letter dated
January 8, 2026

Mohammad Abdullah Al-Khamis For Contracting Est. is registered in the Saudi Aramco Supplier Management System, e-reference 0016242, on condition that the company continues to meet all Saudi Arabian and Saudi Aramco standards.

See the letter

Saudi Contractors Authority

Contractor membership certificate

Membership no.
1960196028
Issued
June 22, 2026
Valid until
June 22, 2027

The certificate can be checked on the authority’s contractor register at muqawil.org.

See the certificate

Commercial registration

Mohammad Abdullah Al-Khamis For Contracting Est.

CR no.
7028552532
Address
King Khalid Street
City
Ad-Dammam 32241

Trading as MAAK Contracting Co., with branches in Al Ahsa and Al Jubail. VAT registration 311251170800003.

See the certificate

Chamber of Commerce

Chamber membership

Registration
347802
Bank reference
SAB
Website
www.maaksa.com

Bank reference: SAB, The Saudi Awwal Bank.

See the certificate

§ 2Documents on fileالمستندات الرسمية

The certificates, on the record.

Copies from the MAAK company profile. Select a document to read it full size.

DOC 01 / 05
Saudi Aramco supplier registration approval letter
Supplier registration letterSaudi Aramco · Vendor code 10117985
DOC 02 / 05
Saudi Contractors Authority membership certificate
Contractor membershipSaudi Contractors Authority · Valid to June 22, 2027
DOC 03 / 05
VAT registration certificate
VAT registrationZakat, Tax and Customs Authority · 311251170800003
DOC 04 / 05
Commercial registration certificate
Commercial registrationMinistry of Commerce · 7028552532
DOC 05 / 05
Chamber of Commerce membership certificate
Chamber membershipAsharqia Chamber · Membership 347802

Each number can be checked with the issuing authority: the Saudi Aramco Supplier Help Desk, muqawil.org, mc.gov.sa and zatca.gov.sa.

§ 3Codes and standards

Seventeen codes, one rule.

Under all circumstances, Saudi Aramco, Saudi Arabian or other recognised international codes and standards apply.

Saudi AramcoSaudi Aramco Engineering Standards
SASOSaudi Arabian Standards Organization
ASTMAmerican Society for Testing and Materials
ACIAmerican Concrete Institute
AWSAmerican Welding Society
AWWAAmerican Water Works Association
ANSIAmerican National Standards Institute
AGAAmerican Gas Association
AISCAmerican Institute of Steel Construction
AASHTOAmerican Association of State Highway and Transportation Officials
ASHRAEAmerican Society of Heating, Refrigerating and Air-Conditioning Engineers
UPCUniform Plumbing Code
UBCUniform Building Code
ULUnderwriters Laboratories
NFPANational Fire Protection Association
NECNational Electrical Code
UMCUniform Mechanical Code

§ 4Quality assurance and control

Checked before, during and after.

Our QA/QC plan covers the procurement phase, so materials and equipment meet the specifications, and the construction phase, so what we build meets the codes and the drawings.

  1. 01

    Procurement

    Materials and equipment checked against the specifications, codes and drawings, submitted for client approval, and tracked weekly until they arrive.

  2. 02

    Receiving

    Every delivery inspected on arrival, logged and stored to the manufacturer’s requirements, with damaged items reported and replaced.

  3. 03

    Construction

    Daily inspection of excavation, fill tested lift by lift, concrete batching checked on every pour, and sign-off before anything is covered.

  4. 04

    Handover

    Test reports, certified as-built drawings, O&M manuals and spare parts lists filed with the client.

§ 5Health, safety and environment

Safety is planned in.

All men working on the site, from management to labour, should be thoroughly safety oriented.MAAK site safety plan
  • Work permits for hot work, cold work and confined space entry, closed out by both signatories
  • Full personal protective equipment issued to the client’s requirement
  • Weekly toolbox talks, with signed attendance
  • Job safety analysis training for critical crafts
  • In-house safety orientation for every new starter
  • Ground fault circuit interrupters on all temporary supplies
  • Electrical tools and equipment inspected every seven days, and recorded
  • No site tools above 125 V
  • Crane and lifting inspection stickers kept current
  • Heavy equipment run only by operators with a valid KSA licence
  • Test trenches dug by hand before any mechanical excavation near cables
  • Emergency plan, assembly points and head counts on every site
  • Waste segregated and removed daily to designated areas
  • No ozone-depleting chemicals on any project

RFQEnquiries for services and projectsاطلب عرض سعر

Tell us about the job.

Send the scope, the location and when you need us. An engineer replies with questions or a quotation, usually the same working day.

What is this about?