Blasted clean, coated to spec.
Abrasive blasting and protective coatings for steel and concrete: structures, piping, tanks and floors, applied by crews trained to Saudi Aramco and SABIC requirements.
§ 1Overview
Abrasive blasting, linings, fireproofing, crack injection, waterproofing.
Coating systems for structural steel, crane rails, piping and equipment, onshore or coastal, inside and out. Surfaces in contact with acids and corrosive chemicals get linings chosen for that chemical.
For concrete, we find the cause of damage first, whether reinforcement corrosion, sulphate attack, salt attack or spalling, then repair it to the standard procedure.
§ 2Scope of work
What we take on.
Blasting and painting
- Steel structures, pipe spools and random pipes
- Tanks of any type and size, inside and out
- Static equipment and field joints
- New coating and recoating, protective and decorative
- Epoxy flooring
Linings and special systems
- Acid-resistant and chemical linings
- Concrete surface coating and lining
- Fiberglass mat lining
- Intumescent fireproofing, cellulosic and hydrocarbon
- Fusion bonded epoxy (FBE) repair
- Underground pipe wrapping
Concrete protection
- Concrete rehabilitation
- Crack injection with polyurethane or epoxy resin
- Sealant application and replacement
- Waterproofing
- Construction and renovation
§ 3Try it
Blast it back to near-white metal.
Drag across the plate to remove the rust and mill scale. At Sa 2½ the surface is ready for the coating system.
- Surface preparationSa 2½
- ApplicationAirless spray
- ChecksProfile · DFT
§ 4In the field
On site, at work.
Representative photographs of this kind of work.




§ 5How we work
One QA/QC plan, four stages.
- 01
Procurement
Materials and equipment checked against the specifications, codes and drawings, submitted for client approval, and tracked weekly until they arrive.
- 02
Receiving
Every delivery inspected on arrival, logged and stored to the manufacturer’s requirements, with damaged items reported and replaced.
- 03
Construction
Daily inspection of excavation, fill tested lift by lift, concrete batching checked on every pour, and sign-off before anything is covered.
- 04
Handover
Test reports, certified as-built drawings, O&M manuals and spare parts lists filed with the client.
MAAKClientsعملاؤنا