Any type, any size, any phase.

An experienced team that erects and dismantles scaffolding of any type and size, for new construction, maintenance and shutdown work.

SCF · Division 05 of 08 خدمات السقالات Enquire about this service
5scaffold systems
Any phaseconstruction, maintenance, shutdown
Erect + strikeone team from start to finish
Scaffolding
Fig. 05.1 · ScaffoldingPhoto: Paul Becker

§ 1Overview

Tower, suspended, O-tower, Cuplock and tube-and-coupler systems.

Scaffolds are designed around the job: independent towers for access, suspended platforms under structures, O-towers around vessels, system scaffold for speed and tube and coupler where the geometry is awkward.

§ 2Scope of work

What we take on.

Systems

  • Independent tower scaffolding
  • Suspended platform scaffolding
  • O-tower scaffolding
  • System scaffold (Cuplock)
  • Tube and coupler scaffold

Sectors

  • Oil and gas
  • Petrochemicals
  • Power
  • Infrastructure
  • Industrial and SWRO
  • Facilities
  • Construction

§ 3Typical elevation

A tube-and-coupler bay, member by member.

Base plates and sole boards, standards, ledgers and transoms, bracing, then boards and toe boards at the working lift.

Oil and gasPetrochemicalsPowerInfrastructureIndustrial and SWROFacilitiesConstruction
Typical elevation

§ 4In the field

On site, at work.

Representative photographs of this kind of work.

Crew on a facade scaffold
Fig. 05.2 · Crew on a facade scaffoldPhoto: Jon Tyson
Full-height access scaffold
Fig. 05.3 · Full-height access scaffoldPhoto: Reto Simonet
Inspection under a tube-and-coupler bay
Fig. 05.4 · Inspection under a tube-and-coupler bayPhoto: Clem Onojeghuo
System scaffold detail
Fig. 05.5 · System scaffold detailPhoto: Jack B

§ 5How we work

One QA/QC plan, four stages.

  1. 01

    Procurement

    Materials and equipment checked against the specifications, codes and drawings, submitted for client approval, and tracked weekly until they arrive.

  2. 02

    Receiving

    Every delivery inspected on arrival, logged and stored to the manufacturer’s requirements, with damaged items reported and replaced.

  3. 03

    Construction

    Daily inspection of excavation, fill tested lift by lift, concrete batching checked on every pour, and sign-off before anything is covered.

  4. 04

    Handover

    Test reports, certified as-built drawings, O&M manuals and spare parts lists filed with the client.

MAAKClientsعملاؤنا

Owners and EPC contractors we work for.

Saudi AramcoSABICSaudi Electricity Co.Ma'adenMarafiqSATORPSadaraLarsen & ToubroHyundai E&CSamsung E&AJGCSaipemSinopecDoosanTekfen
SEPCOIIIWisonEnppiRema Tip TopCCCSinohydroJAL InternationalSK E&CHanwhaAl RushaidCPPChina Petroleum PipelineGusanGAMAAl Yamama

Need scaffolding? Tell us about the job.