Steel made in our shop, erected on your site.

Structural steel fabrication and erection for light, medium and heavy work, with pre-engineered buildings, pipe spools, pipelines and storage tanks for industrial plants.

MEC · Division 01 of 08 الأعمال الميكانيكية والحديد Enquire about this service
3weight classes: light, medium, heavy
Shop + sitefabrication and erection
PEBsheds, warehouses, canopies
Mechanical, steel & piping
Fig. 01.1 · Mechanical, steel & pipingPhoto: D R

§ 1Overview

Structural steel, PEB, pipe spools, pipelines and tanks, fabricated and erected.

We fabricate, weld and erect structural steel for industrial, commercial and residential projects, in our workshop and on your site. The workshop sits between Jubail and Dammam, close to the fabrication yards and the plants we serve.

Pre-engineered buildings are designed to the exact requirement of each job, so the frame, roofing, cladding and ceilings arrive ready to erect.

§ 2Scope of work

What we take on.

Steel structures

  • Steel structure fabrication and erection
  • Pipe racks and platforms
  • Mezzanine floors
  • Customised steel work
  • Structural fabrication for pipeline and tank foundations

Buildings

  • Pre-engineered buildings (PEB)
  • Prefabricated steel buildings and sheds
  • Warehouses and showrooms
  • Metal roofing and wall cladding
  • Metal false ceilings and canopies

Piping and tanks

  • Pipe spools, random pipes and pipe supports
  • Pipelines
  • Storage tanks, internal and external work
  • Mechanical erection and installation
  • Operation and maintenance support

§ 3Built for

Heavy industry, infrastructure and towers.

  • 01Oil and gas fields
  • 02Refineries and smelters
  • 03Petrochemical plants
  • 04Power plants
  • 05Steel rolling mills
  • 06Airports and hangars
  • 07Seaports
  • 08Depots and yards
  • 09High-rise towers

§ 4In the field

On site, at work.

Representative photographs of this kind of work.

Site welding at height
Fig. 01.2 · Site welding at heightPhoto: Jason Richard
Pre-engineered frame erection
Fig. 01.3 · Pre-engineered frame erectionPhoto: david Griffiths
Pipeline in open trench
Fig. 01.4 · Pipeline in open trenchPhoto: SELİM ARDA ERYILMAZ
Storage tanks and pipe bridge
Fig. 01.5 · Storage tanks and pipe bridgePhoto: Leon Jacobs

§ 5How we work

One QA/QC plan, four stages.

  1. 01

    Procurement

    Materials and equipment checked against the specifications, codes and drawings, submitted for client approval, and tracked weekly until they arrive.

  2. 02

    Receiving

    Every delivery inspected on arrival, logged and stored to the manufacturer’s requirements, with damaged items reported and replaced.

  3. 03

    Construction

    Daily inspection of excavation, fill tested lift by lift, concrete batching checked on every pour, and sign-off before anything is covered.

  4. 04

    Handover

    Test reports, certified as-built drawings, O&M manuals and spare parts lists filed with the client.

MAAKClientsعملاؤنا

Owners and EPC contractors we work for.

Saudi AramcoSABICSaudi Electricity Co.Ma'adenMarafiqSATORPSadaraLarsen & ToubroHyundai E&CSamsung E&AJGCSaipemSinopecDoosanTekfen
SEPCOIIIWisonEnppiRema Tip TopCCCSinohydroJAL InternationalSK E&CHanwhaAl RushaidCPPChina Petroleum PipelineGusanGAMAAl Yamama

Need mechanical & steel? Tell us about the job.