Keep it running, or take it down cleanly.
Planned and breakdown maintenance for plants and housing, shutdown work, and demolition that clears a structure without losing the equipment worth keeping.
§ 1Overview
Industrial and housing maintenance, shutdowns, demolition, dismantling.
Our maintenance teams come with complete tools and equipment, from office and engineering staff to supervisors, technicians and crews. For housing, a preventive programme covers electrical, plumbing, air conditioning and household appliances.
For demolition we dismantle plants, hangars and tanks and demolish buildings, recovering costly items such as boilers, chimneys, coolers, motors and pumps, and clear the debris from site.
§ 2Scope of work
What we take on.
Industrial maintenance
- Electrical and plumbing maintenance
- Concrete rehabilitation
- Waterproofing, blasting and coating
- Acid-resistant coating
- Shutdown maintenance
- Equipment and spare parts, onshore and offshore
Housing and facilities
- Housing maintenance
- Air conditioners and home appliances
- Plumbing and janitorial works
- Electrical and home modification
- Pest control and cleaning
- Gardening and landscaping
Demolition and dismantling
- Building demolition
- Plant and hangar dismantling
- Tank dismantling
- Concrete destruction
- Recovery of boilers, motors and pumps
- Debris removal and site clearing
§ 3Dismantling
Taken down, not thrown away.
Plants are dismantled without damage to the sensitive areas, and the costly items are recovered, then handled, stored, packed and delivered under documented procedures.
- 01Boilers and boiler accessories
- 02Chimneys
- 03Coolers
- 04Process apparatus
- 05Heating tubes
- 06Motors
- 07Pumps
§ 4In the field
On site, at work.
Representative photographs of this kind of work.




§ 5How we work
One QA/QC plan, four stages.
- 01
Procurement
Materials and equipment checked against the specifications, codes and drawings, submitted for client approval, and tracked weekly until they arrive.
- 02
Receiving
Every delivery inspected on arrival, logged and stored to the manufacturer’s requirements, with damaged items reported and replaced.
- 03
Construction
Daily inspection of excavation, fill tested lift by lift, concrete batching checked on every pour, and sign-off before anything is covered.
- 04
Handover
Test reports, certified as-built drawings, O&M manuals and spare parts lists filed with the client.